| 09 29 00 | 09-0000 - Drywall | Frame and finish classroom acoustic partitions | Full-height acoustic separation with sealed perimeter; inspect above-ceiling firestopping. | Representative Scope | Scope Item | Sample Drawing Set :: sheet A2.01… | — | 5800 | SF | — | 5800 | — | 8.5 | 49300 | Sample estimator budget; confirm against trade quote. | — |
| 09 29 00 | 09-0000 - Drywall | Build administration reception and privacy partitions | Maintain staff access during phased work; acoustic seal at private meeting room. | Representative Scope | Scope Item | Sample Drawing Set :: sheet A2.02… | — | 1400 | SF | — | 1400 | — | 10 | 14000 | Sample estimator budget; confirm against trade quote. | — |
| 09 51 13 | 09-0000 - Drywall | Install classroom acoustic ceiling systems | Coordinate lighting grid and access panels; alternate tile availability is unresolved. | Representative Scope | Scope Item | Sample Drawing Set :: sheet A2.11… | — | 8800 | SF | — | 8800 | — | 5.5 | 48400 | Sample estimator budget; confirm against trade quote. | — |
| 09 29 00 | Not assigned | Submit product data and coordinated shop drawings for approval — Drywall | Before procurement | submittals Documents | Product Data | | — | — | — | — | — | — | — | — | — | — |
| 09 51 13 | Not assigned | Submit product data and coordinated shop drawings for approval — Drywall | Before procurement | submittals Documents | Product Data | | — | — | — | — | — | — | — | — | — | — |
| 09 29 00 | Not assigned | Book concealed-work inspections before covering rough-in — Drywall | 48 hours before inspection | submittals Documents | Inspection | | — | — | — | — | — | — | — | — | — | — |
| 09 51 13 | Not assigned | Book concealed-work inspections before covering rough-in — Drywall | 48 hours before inspection | submittals Documents | Inspection | | — | — | — | — | — | — | — | — | — | — |
| 09 29 00 | Not assigned | Deliver as-builts, warranties, training, and operation manuals — Drywall | Before owner acceptance | closeout Documents | Turnover | | — | — | — | — | — | — | — | — | — | — |
| 09 51 13 | Not assigned | Deliver as-builts, warranties, training, and operation manuals — Drywall | Before owner acceptance | closeout Documents | Turnover | | — | — | — | — | — | — | — | — | — | — |
| 09 51 13 | Not assigned | GC Master review item | See the Review List worksheet on the GC Master workbook for this source. | Trade Review | Bid Risk Reference | | Resolve through the Review List worksheet on the GC Master workbook | — | — | — | — | — | — | — | — | — |